
Site Preparation 5
subzero.com/specs
Before You Start
M
ake sure the opening dimensions, door clearance,
electrical service and plumbing are correct for the model
you are about to install. Refer to specifications on the
following pages.
IMPORTANT NOTE: To operate properly, the door must
open a minimum of 90°. Use a minimum 3" (76) filler in
corner installations to assure a 90° door opening. Allow
enough clearance in front of the unit for full door swing.
TOOLS AND MATERIALS REQUIRED
• Appliance dolly able to support 130 lbs (59 kg)
• Level —2' (.6 m) and 4' (1.2 m) recommended
• Phillips and slotted screwdriver sets
• Wrench set and allen wrench set
• Crescent wrenches
• Various sized pliers
•
5
/16" hex bolt nut driver
• Drill and assorted drill bits
• 4' (1.2 m) of
1
/4" copper tubing and saddle valve
(4200880) for the water line (model UC-24CI)
• Copper tubing cutter (model UC-24CI)
• Masonite, plywood,
1
/8" pressed fiberboard, cardboard
or other suitable material to protect finished flooring
Comentarios a estos manuales